What are you looking for?

Type your keyword and search.

Growth

  • Government of India (GoI) divested 51% equity in the year 2001 in favour of Sterlite Industries (I) Limited. Remaining 49% is with GoI.
  • Superior Quality and Craftsmanship
  • BALCO is playing a crucial role in introducing Aluminium as a potential alternative to other metals like Steel in construction, and Copper in power transmission industry.
  • Major operations of BALCO are in the town of Korba (Chhattisgarh), whereas its mines supplying high grade Bauxite are situated at Kawardha and Mainpat.
  • The smelter capacity produces 345 KTPA through modern Prebake Technology based on Soderberg Process.
  • After disinvestment, a smelter of capacity 245 KTPA has been established in the year 2004.
  • The smelter plants are being supported by uninterrupted power supply through Captive Power Plants – 270 MW at Jamnipali, Korba and 540 MW at smelter site.
  • New power plant with rated capacity of 1200 MW. Commence its operation from 2016.
  • Finishing lines are capable of producing high quality Ingots, Wire Rods, Busbars and Rolled products.